<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>Sustainable Architecture &amp; Interior Design</provider_name><provider_url>https://alvbi.com/es</provider_url><author_name>debi.alvaradobiran@gmail.com</author_name><author_url>https://alvbi.com/es/author/debi-alvaradobirangmail-com/</author_url><title>CPA - Sustainable Architecture &amp; Interior Design</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content" data-secret="taMJQlmMry"&gt;&lt;a href="https://alvbi.com/es/portfolio/cpa/"&gt;CPA&lt;/a&gt;&lt;/blockquote&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://alvbi.com/es/portfolio/cpa/embed/#?secret=taMJQlmMry" width="600" height="338" title="&#xAB;CPA&#xBB; &#x2014; Sustainable Architecture &amp; Interior Design" data-secret="taMJQlmMry" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;&lt;script&gt;
/*! This file is auto-generated */
!function(d,l){"use strict";l.querySelector&amp;&amp;d.addEventListener&amp;&amp;"undefined"!=typeof URL&amp;&amp;(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&amp;&amp;!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i&lt;o.length;i++)o[i].style.display="none";for(i=0;i&lt;a.length;i++)s=a[i],e.source===s.contentWindow&amp;&amp;(s.removeAttribute("style"),"height"===t.message?(1e3&lt;(r=parseInt(t.value,10))?r=1e3:~~r&lt;200&amp;&amp;(r=200),s.height=r):"link"===t.message&amp;&amp;(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&amp;&amp;n.host===r.host&amp;&amp;l.activeElement===s&amp;&amp;(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r&lt;s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document);
//# sourceURL=https://alvbi.com/wp-includes/js/wp-embed.min.js
&lt;/script&gt;</html><description>CPA Restoration &amp; Enhancement Vision The project involved the partial restoration and enhancement of the third floor of the Professional Surveyors&#x2019; Association headquarters, covering a total area of 119 m&#xB2;. The intervention focused on adapting and reusing the existing spaces to improve functionality while updating the overall conditions and quality of use. Location CABA, Argentina Project Type institucional Area 119 m&#xB2; Scope Design &amp; Construction Management Project The intervention was developed with respect for the building&#x2019;s architectural character, prioritizing the reuse of existing elements, the incorporation of understated materials, and continuity with the original material language. Existing window and door frames were restored and reused as part of the project, while the same flooring found in other areas of the building was retained, preserving its color palette, style, and institutional architectural identity. Through targeted functional adaptations and spatial reorganization, the project improved the use of the existing floor plan and enhanced the flow of natural light into the different spaces. The result was a more functional and comfortable work environment, while also bringing deteriorated or underused areas back into use. Scope of Work Restoration of a storage room affected by moisture The space, originally used as a storage room, underwent comprehensive remediation due to advanced moisture issues and deterioration. Through the reorganization of the area and the incorporation of finishes consistent with the existing building, the space was transformed into an office with a small adjoining storage area. Terrace refurbishment The terrace underwent general restoration and refurbishment works, improving its usability and maintenance conditions as part of the overall intervention. Addition of a new men&#x2019;s restroom An existing storage room was converted into a new men&#x2019;s restroom, optimizing the distribution and functionality of the sanitary facilities on the floor. Reorganization of existing restrooms As part of the intervention, the existing shared restroom was converted into a women&#x2019;s-only restroom, allowing for a more efficient and functional organization of the facilities.An existing storage room was converted into a new men&#x2019;s restroom, optimizing the distribution and functionality of the sanitary facilities on the floor.</description><thumbnail_url>https://alvbi.com/wp-content/uploads/elementor/thumbs/10-1-rosg8n6nupfrqzmzi7l3el3virslc1ks40s55o0a74.jpg</thumbnail_url></oembed>
